Rail Work

We pride ourselves on our reputation and the work we have delivered in this sector. 

Our workforce and volume of PTS trained operatives enables us to deliver a large volume of work in the tightest of parameters, when working within the restraints of possession and isolations.

We are a current Network Rail appointed Frameworks contractor, attending to Emergency’s Nationwide n a regular basis offering a 24 hour call out service which our customers can rely on.

Recent Major Rail Projects we have delivered are as follows -

  • Crewe Railway Station Phase 1, slung scaffolding throughout the Roof Space over the Overhead Line Equipment.
  • Oxenholme Railway Station, Designed Access Scaffolding, to accommodate Station Building Refurbishment.
  • Penrith Train Station, Designed Access Scaffold, to accommodate a re-roof and Chimney Repairs.
  • Wigan Wallgate Train Station, A Temporary Roof Cover over the entire station buildings.
  • Runcorn Viaduct, A Cantilevered scaffold over the River Mersey (see site Specific Case Study)
  • Carlisle Train Station, Multiple Large System scaffolds erected and dismantled during possession and isolation to accommodate inspections of the weather damaged roof structure.